Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Omlöp vid småskaliga vattenkraftverk, hållbarhet för både verk och miljö?: Mätning av effektförluster orsakade av omlöpet vid Åby vattenkraftverk i Växjö kommun.
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
2017 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Bio channels for small hydropower plants, sustainability for both the power plant and the environment? : Measurement of effect losses caused by the bio channel at Åby hydropower plant in Växjö municipality. (English)
Abstract [sv]

I Sverige finns cirka 2000 vattenkraftverk men endast 10 procent har någon form av omlöp eller annan lösning (Risinger, 2012).

Nya, strängare regler håller nu på att införas. Sedan 2014 finns en gemensam strategi från Energimyndigheten och Havs- och vattenmyndigheten för åtgärder i svensk vattenkraft (Risinger, 2014). En godkänd fiskväg är ett av kraven.Särskilt den småskaliga vattenkraften (energitillförsel under 10 MWh enligt Risinger (2012)) drabbas. Deras intäkter står många gånger i proportion till energiproduktionen och därmed saknas ofta de ekonomiska förutsättningarna för en fiskväg. Vidare kommer en del av vattnet, och därmed potentiella inkomster, att gå förlorade.

Den här undersökningen syftar till att utröna vad ett omlöp får för konsekvenser i form av effektförluster. Det är naturligtvis omöjligt att komma fram till ett universellt svar. Istället mäts förlusterna hos ett specifikt mindre verk som redan har ett omlöp: Åby vattenkraftverk som ägs och drivs av Växjö kommun. Metoden som används är traversering i kombination med hydroskopisk flygel. Sedan tidigare finns beräknade värden från kommunen för flödet i omlöpet. Dessa jämförs med undersökningens uppmätta värden.

Undersökningen visar att vid normalt vattenstånd (165,13 MÖH) flödar 167 ± 10 l/s vatten genom omlöpet. Detta är ett 70 l/s större flöde i jämförelse med kommunens beräknade värde. Förklaringar till den skillnaden ges av mätfel då djupet mättes och att inloppet hade byggts om mellan kommunens beräkningar och utförda mätningar. Även den formel som användes då de beräknade värdena togs fram föreslås som en tänkbar felkälla. 167 ± 10 l/s innebär ett bortfall om 4,2 ± 0,3 kW potentiell effekt.

Abstract [en]

There are around 2000 hydropower plants in Sweden, but only 10 percent of them has a bio channel, fishway or equivalent solution (Risinger 2012).

New, more strict rules are now about to be introduced. Since 2014 there is a mutual strategy from the two Swedish authorities ”Energimyndigheten” and ”Havs- och vattenmyndigheten”, which demands multiple actions from Swedish hydropower. (Risinger, 2014). An approved fishway is one of these.The small-scale hydropower plants (plants who produce less than 10 MWh according to Risinger (2012)) are especially affected from this. Their income is proportional to their production and therefore they’ll usually lack the economical ability to build a fishway. Furthermore, a part of the streaming water (which otherwise would equal income) will get lost.

This study aims to decide the loss of effect a fishway causes. Of course, it is impossible to derive a universal answer. Instead the losses are measured at a specific smaller plant that already has a fishway: Åby hydropower plant that is owned and operated by Växjö municipality. Method being used is traversing in combination with a turbine flow meter. There are already calculated flows made by the municipality. These values will be compared with the measured values.

The study shows that at a normal water level (165,13 m.a.sl) 167 ± 10 l/s of water is streaming through the fishway. This is a 70 l/s bigger flow in comparison with the municipality’s calculations. An explanation to this difference is given by measurement errors when the depth was measured, that the intake had been modified between when the calculations was being made and when the study’s measurements took place. Also, the formula being used for the calculated values is proposed as a possible source of error. 167 ± 10 l/s will result in a loss of 4,2 ± 0,3 kW potential effect.

Place, publisher, year, edition, pages
2017. , 41 p.
Keyword [en]
Measurement of flow, small scale hydropower, bio channel, fishway, energy losses, traversing, turbine flow meter, Mörrumsån, Åby hydropower plant, Sweden’s water framework directive.
Keyword [sv]
Flödesmätning, småskalig vattenkraft, omlöp, fiskväg, energiförluster, traversering, hydrometrisk flygel, Mörrumsån, Åby vattenkraftverk, nya vattendirektivet
National Category
Ocean and River Engineering
Identifiers
URN: urn:nbn:se:lnu:diva-63792OAI: oai:DiVA.org:lnu-63792DiVA: diva2:1095173
Supervisors
Examiners
Available from: 2017-05-22 Created: 2017-05-12 Last updated: 2017-05-22Bibliographically approved

Open Access in DiVA

fulltext(2322 kB)13 downloads
File information
File name FULLTEXT01.pdfFile size 2322 kBChecksum SHA-512
970f52bfbbc864f14df0f67acf7ff0fbebde0a846ce9e20fba8bcc5f54abc734537b741b8a6f1ca70d1b8400d8816b0b1f4891d2bb291974186720fd12c65eb8
Type fulltextMimetype application/pdf

By organisation
Kalmar Maritime Academy
Ocean and River Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 13 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 47 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf