Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Approach for Automated Planning Using 5D-BIM
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0003-4843-8936
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-1744-4981
Veidekke Entreprenad AB.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-2699-2533
Number of Authors: 4
2016 (English)In: Proceedings of the 33rd CIB W78 Conference 2016, Oct. 31st-Nov. 2nd 2016, Brisbane, Australia, 2016Conference paper, Published paper (Refereed)
Abstract [en]

Early planning decisions are usually dependent on time-demanding, manually produced cost estimations and schedules. There is a trend in the construction industry to use 5D-BIM to speed up these processes and automated approaches can be used to further improve effectiveness. This research aims to investigate how to create an automated 5D-BIM planning process when using industrialized building systems. We propose an approach that combines a BIM manual with predefined databases based on the building system and its properties. A case study at one of Scandinavia’s largest construction and property development companies was conducted where the presented approach was tested. The findings show that planning using 5D-BIM is possible to partially automate through our approach but that there are challenges for a fully automated process in the standardization required and assuring that the quality of data in each step is adequate.

Place, publisher, year, edition, pages
2016.
Keyword [en]
5D-BIM, automation, industrialized house-building, building system
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
URN: urn:nbn:se:ltu:diva-60851OAI: oai:DiVA.org:ltu-60851DiVA: diva2:1051180
Conference
33rd CIB W78 Conference 2016, Oct. 31st-Nov. 2nd 2016, Brisbane, Australia
Available from: 2016-12-01 Created: 2016-12-01 Last updated: 2017-11-24Bibliographically approved

Open Access in DiVA

fulltext(523 kB)