VALIDATION AND CONFORMITYTEST OF CGMES MODELS OFENTSO-E TEST NETWORKS
KTH, School of Electrical Engineering (EES).
2016 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [sv]

För att uppnå optimal resursdelning och öka hållbar energiförsörjning, stiger behovet av gränsöverskridande kraftöverföring ständigt. Därför frekventa utbyta information med detaljerade galler uppgifter krävs. För att standardisera sådant utbyte och därigenom främja gemensam kraftsystemstudier i Europa, Common Grid Model Exchange Standard (CGMES) grundar sig på IEC CIM (Common Information Models) utfärdats av ENTSO-E (European Network of Transmission Operators for Electricity) i 2013. En CGMES bedömning av överensstämmelse processen också inrättats att uppmuntra och undersöka antagandet av CGMES med relevanta kraftsystemtillämpningar. Huvudsyftet med denna avhandling är att validera att Network Manager produkten av ABB har genomfört CGMES ordentligt. Effektflödesberäkningar utförs baserat på ENTSO-Es provnäten och erhållna lösningarna jämförs med standard resultat samt resultaten från Power Factory (ett kraftsystem analysverktyg från DIgSILENT som redan har passerat bedömningen av överensstämmelse med framgång). Jämförelse resultaten analyseras alltså för att identifiera orsakerna till eventuella avvikelser från standardeffektflödeslösningar och ge förslag på framtida utveckling av Network Manager.

Abstract [en]

To achieve optimal resource sharing and enhance the sustainability of energy supply, the need for cross-border power transmission is continuously growing. Therefore, frequent information exchange with detailed grid data is required. To standardize such exchange and thus to facilitate common power system studies in Europe, the Common Grid Model Exchange Standard (CGMES) based on IEC CIM (Common Information Models) was issued by ENTSO-E (European Network of Transmission Operators for Electricity) in 2013. A CGMES conformity assessment process was also set up to encourage and examine the adoption of CGMES with relevant power system applications. The main purpose of this thesis is to validate that the Network Manager product of ABB has implemented CGMES properly. Power flow calculations are performed based on ENTSO-E’s test networks and the solutions obtained are compared with the standard results as well as the results from Power Factory (a power system analysis tool from DIgSILENT that has already passed the conformity assessment successfully).  The comparison results are analyzed thus to identify causes of any variation from the standard power flow solutions and to give suggestions for future development of Network Manager.

Place, publisher, year, edition, pages
2016. , 40 p.
Series
EES Examensarbete / Master Thesis, TRITA EE 2016:144
Keyword [en]
IEC CIM, CGMES and conformity assessment, Network Manager, Power Factory, power flow calculation.
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:kth:diva-196223OAI: oai:DiVA.org:kth-196223DiVA: diva2:1046364
External cooperation
ABB Västerås
Examiners
Available from: 2016-11-14 Created: 2016-11-14 Last updated: 2016-11-15Bibliographically approved

Open Access in DiVA

fulltext(2711 kB)9 downloads
File information
File name FULLTEXT01.pdfFile size 2711 kBChecksum SHA-512
5f135acb3dbdf343175e82ce66f68ba85fc8ebf1078b7e229fa1f5a3df9016022eec489213e1fdcfed7bed1f74ed2078234a2bdedcf5950cc7932f579912b928
Type fulltextMimetype application/pdf

By organisation
School of Electrical Engineering (EES)
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 9 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 4 hits
ReferencesLink to record
Permanent link

Direct link