Change search
ReferencesLink to record
Permanent link

Direct link
On the delivery robustness of train timetables with respect to production replanning possibilities
RISE, Swedish ICT, SICS. IAM.
RISE, Swedish ICT, SICS. IAM.
RISE, Swedish ICT, SICS. IAM.
Tågplan2015.
Number of Authors: 4
2012 (English)Conference paper (Refereed)
Abstract [en]

Measuring timetable robustness is a complex task. Previous efforts have mainly been focused on simulation studies or measurements of time supplements. However, these measurements don't capture the production flexibility of a timetable, which is essential for measuring the robustness with regard to the trains' commercial activity commitments, and also for merging the goals of robustness and efficiency. In this article we differentiate between production timetables and delivery timetables. A production timetable contains all stops, meetings and switch crossings, while a delivery timetable only contains stops for commercial activities. If a production timetable is constructed such that it can easily be replanned to cope with delays without breaking any commercial activity commitments it provides delivery robustness without compromising travel efficiency. Changing meeting locations is one of the replanning tools available during operation, and this paper presents a new framework for heuristically optimising a given production timetable with regard to the number of alternative meeting locations. Mixed integer programming is used to find two delivery feasible production solutions, one early and one late. The area between the two solutions represents alternative meeting locations and therefore also the replanning enabled robustness. A case study from Sweden demonstrates how the method can be used to develop better production timetables.

Place, publisher, year, edition, pages
2012, 15.
Keyword [en]
Robustness, replanning, train timetable
National Category
Computer and Information Science
Identifiers
URN: urn:nbn:se:ri:diva-24073OAI: oai:DiVA.org:ri-24073DiVA: diva2:1043152
Conference
2nd International Conference on Road and Rail Infrastructure
Projects
Tågplan2015
Available from: 2016-10-31 Created: 2016-10-31

Open Access in DiVA

fulltext(675 kB)4 downloads
File information
File name FULLTEXT01.pdfFile size 675 kBChecksum SHA-512
a75ccf8c1c1ccf08eaf6dd2de075ecabbfef61928f0eacec2984298ab1c4b3bc12b1c1bd6ce3b469f95d8399000f9e27b50c452e24f8529c827e803865d79236
Type fulltextMimetype application/pdf

By organisation
SICS
Computer and Information Science

Search outside of DiVA

GoogleGoogle Scholar
Total: 4 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 7 hits
ReferencesLink to record
Permanent link

Direct link