Change search
ReferencesLink to record
Permanent link

Direct link
The TUFF train scheduler: two duration trip scheduling on single track networks
Show others and affiliations
Number of Authors: 6
1997 (English)In: CP'97 Workshop on Industrial Constraint-Driven Scheduling, 1997, 1, , 12 p.Conference paper (Refereed)
Place, publisher, year, edition, pages
1997, 1. , 12 p.
National Category
Computer and Information Science
Identifiers
URN: urn:nbn:se:ri:diva-22643OAI: oai:DiVA.org:ri-22643DiVA: diva2:1042208
Conference
CP'97 Workshop on Industrial Constraint-Driven Scheduling
Note
A. Davenport, editor. ftp://ftp.sics.se/pub/isl/papers/cp97_ws.ps.gzAvailable from: 2016-10-31 Created: 2016-10-31

Open Access in DiVA

fulltext(990 kB)1 downloads
File information
File name FULLTEXT01.pdfFile size 990 kBChecksum SHA-512
9559e17b358cef4676037978708908d1fb06a83d85c91ec241c8f5e4b5b4e4b04c58bab8927a20bd52377f453de37acac9d36f33fe431da567cbb06337b11a61
Type fulltextMimetype application/pdf
fulltext(660 kB)0 downloads
File information
File name FULLTEXT02.psFile size 660 kBChecksum SHA-512
852bedf160d37a150d3c9b2c7edad1cb4f07aa8d5aba21996619f28094153e7e37f8ba5dcdacadde4b4e0fe793a8596c11c261821f30e843d2289f6713f9baaa
Type fulltextMimetype application/postscript

Computer and Information Science

Search outside of DiVA

GoogleGoogle Scholar
Total: 1 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 5 hits
ReferencesLink to record
Permanent link

Direct link