Change search
ReferencesLink to record
Permanent link

Direct link
Termisk och ekonomisk utvärdering av konvertergaskylning för befintliga och framtida behov vid Boliden Mineral AB – Rönnskärsverken
2016 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Place, publisher, year, edition, pages
2016. , 56 p.
Keyword [en]
Keyword [sv]
Teknik, Gaskylning, termiskutvärdering, ekonomiskutvärdering, konvertergas, tvåkonverterdrift
URN: urn:nbn:se:ltu:diva-56532Local ID: d4b3c01d-01a5-437f-b9fb-7ecb8d473dfeOAI: diva2:1029919
External cooperation
Subject / course
Student thesis, at least 30 credits
Educational program
Sustainable Energy Engineering, master's level
Validerat; 20160817 (global_studentproject_submitter)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

fulltext(1808 kB)0 downloads
File information
File name FULLTEXT02.pdfFile size 1808 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

ReferencesLink to record
Permanent link

Direct link