Change search
ReferencesLink to record
Permanent link

Direct link
Lean Construction i teori och praktik
2007 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Place, publisher, year, edition, pages
Keyword [en]
Keyword [sv]
Teknik, Lean production, Lean construction, Kaizen, Just in time, TPS, Toyota produktions system
URN: urn:nbn:se:ltu:diva-54513ISRN: LTU-EX--07/021--SELocal ID: b76d6132-89d4-4eaf-951b-5e0fe605ce2bOAI: diva2:1027895
Subject / course
Student thesis, at least 30 credits
Educational program
Civil Engineering, master's level
Validerat; 20101217 (root)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

fulltext(657 kB)0 downloads
File information
File name FULLTEXT01.pdfFile size 657 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

ReferencesLink to record
Permanent link

Direct link