Change search
ReferencesLink to record
Permanent link

Direct link
Optimering av platsplanerad byggproduktion
2014 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Place, publisher, year, edition, pages
Keyword [en]
Keyword [sv]
Teknik, Line of Balance, byggproduktion
URN: urn:nbn:se:ltu:diva-47988Local ID: 578db5c8-53c3-4378-8cda-7a05df1b01c5OAI: diva2:1021325
External cooperation
Subject / course
Student thesis, at least 30 credits
Educational program
Architectural Engineering, master's level
Validerat; 20141003 (global_studentproject_submitter)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

fulltext(29673 kB)0 downloads
File information
File name FULLTEXT02.pdfFile size 29673 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Medin, Erik

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

ReferencesLink to record
Permanent link

Direct link