Measuring the availability at the sawmill and the capacity at the planing mill at SCA Timber Rundvik sawmill
2009 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

This master thesis was done at SCA Rundvik sawmill. Rundvik sawmill belongs to SCA group. It is produced 231,000 m³ and with the share of developed timber is 61 %. One of two goals with this master thesis is to measure the availability at the sawmill more detailed. It means to start to count a stop as a downtime in the production after 10 seconds instead of 1 minute. And it is to make more stop codes over the sawline to show the sections where the stops appear often. It was not done any analyzes of the stops reasons or made any suggestions how to avoid them. The conclusion does not give any solutions how to increase the availability. The measuring time was 127 hours and the availability gotten during the measuring is 65%. Stops were started to be registered after 10 seconds since they occurred. The sorting of the stops were done. Stops from 10 seconds to 1 minute were sorted like short stops and gave about 2,3 hour per 1 productive week. The distribution of the stops shows the area of the sawing house where the problems exist. These areas are the saw in feed, the sawline, the green sorting, the stick stacker, the chips and sawdust area. The share of the total stop time is viewed around these areas. A brief analyze of the stick stacker area has been done. For the sawline, the use of degree was measured - 76% - and zones (machines) were pointed out if they are in need of an improvement to increase the productivity. The second goal of the work was to check the flow at the planning mill, at the specific section from the in feed to the planer. The assignment at the planer mill is to look at one special product that gives the lack of boards to the planer. According to the data from SCA, the planer needs 200/3,7 ≈ 54 piece/minute in average. The mean value (pieces/minute) that goes really through the planer is 23 pieces/minute. Capacity losses and areas with problems in this section were estimated.

Place, publisher, year, edition, pages
2009.
Keyword [en]
Technology
Keyword [sv]
Teknik
Identifiers
URN: urn:nbn:se:ltu:diva-46122ISRN: LTU-PB-EX--09/009--SELocal ID: 3c35b4f1-fa5d-44d0-a4ff-ac95401d6508OAI: oai:DiVA.org:ltu-46122DiVA: diva2:1019434
Subject / course
Student thesis, at least 30 credits
Educational program
Wood Engineering, master's level
Examiners
Note
Validerat; 20101217 (root)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

fulltext(5017 kB)26 downloads
File information
File name FULLTEXT01.pdfFile size 5017 kBChecksum SHA-512
c7263a1ad518dfe75734ae460b8d165617c0f635bf0ca286ed297a577c1cc3022becf32061525bcf8304d02de33d6802a625b1fcbe8e95c7c6e5c18673460f49
Type fulltextMimetype application/pdf

Search outside of DiVA

GoogleGoogle Scholar
Total: 26 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 11 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf