Change search
ReferencesLink to record
Permanent link

Direct link
Simulering av produktionskapacitet, ledtider och PIA vid kiselkretstillverkningen på Ericsson Components AB
1997 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Place, publisher, year, edition, pages
Keyword [en]
Keyword [sv]
Teknik, Simulering, Produktionskapacitet, Ledtid, PIA, OPT, Ställtid
URN: urn:nbn:se:ltu:diva-44635ISRN: LTU-EX--97/125--SELocal ID: 267f8b9f-ea0c-4dcd-9432-da26150022c1OAI: diva2:1017914
Subject / course
Student thesis, at least 30 credits
Educational program
Civil Engineering programmes 1997-2000, master's level
Validerat; 20101217 (root)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

fulltext(256 kB)0 downloads
File information
File name FULLTEXT01.pdfFile size 256 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

ReferencesLink to record
Permanent link

Direct link