Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
TPM framework for underground mobile mining equipment: a case study
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0002-4107-0991
2011 (English)Conference paper, Oral presentation only (Refereed)
Abstract [en]

In underground mines, mobile mining equipment is critical to the production system. Drill rigs for development and production, vehicles for charging holes, LHDs for loading and transportation, scaling rigs and rigs for reinforcement and cable bolting are all important units in the process to generate a continuous ore flow. For today’s mining companies, high equipment availability is essential to reduce operational and capital costs and to maintain high production. High and controllable reliability is also important especially in attempts to automate the production equipment. This paper compares existing maintenance work in a Swedish and a Tanzanian mine. The various maintenance procedures are identified and evaluated based on a TPM framework.

Place, publisher, year, edition, pages
2011.
National Category
Other Civil Engineering Other Civil Engineering
Research subject
Operation and Maintenance; Mining and Rock Engineering
Identifiers
URN: urn:nbn:se:ltu:diva-37044Local ID: aea6525e-8d5f-47e8-8b74-63e5bf59076cOAI: oai:DiVA.org:ltu-37044DiVA: diva2:1010542
Conference
International Symposium on Mine Planning and Equipment Selection : 12/10/2011 - 14/10/2011
Note
Godkänd; 2011; 20111122 (anngus)Available from: 2016-10-03 Created: 2016-10-03 Last updated: 2017-11-25Bibliographically approved

Open Access in DiVA

fulltext(611 kB)105 downloads
File information
File name FULLTEXT01.pdfFile size 611 kBChecksum SHA-512
dbc707421ec87125898e398c700572b90446d4cd44925c58d748ea91064855ca730798d2973dd75c40cac8c41111911f33ccbaf65f07ae49a630c6085ccd544d
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Gustafson, AnnaSchunnesson, HåkanGalar, Diego
By organisation
Operation, Maintenance and AcousticsMining and Geotechnical Engineering
Other Civil EngineeringOther Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 105 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 135 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf