Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
A model-based production planning and control method supporting delivery of cast-in-place concrete
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.
2008 (English)Conference paper, Oral presentation only (Refereed)
Abstract [en]

This paper combines model-based design and construction techniques with principles from location based planning methods. Both concepts are applied in a practical study in which a model-based method is developed for the planning and control of cast in place concrete deliveries to the building site. The overall aim of this paper is to show a method that can be used to make the planning and control of the delivery process for cast in place concrete more efficient. The paper shows examples of changes in the way the concrete delivery process is handled by different actors. Using model-based working methods allow users to have better control of how for example material properties, such as concrete drying time, affect the planning and control of the delivery process. The paper first provides a background of the research including a description of the case study project. This section is followed by a description of the various methods and systems used in the case study. The application of the method is discussed, based on interviews with both a ready-mixed concrete supplier and a contractor that took part in the case study. The paper is concluded with suggestions for how the method can be further developed and improved to support the scheduling and control of cast in place concrete delivery.

Place, publisher, year, edition, pages
2008.
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
URN: urn:nbn:se:ltu:diva-30564Local ID: 46a6a9d0-bafe-11dd-b223-000ea68e967bOAI: oai:DiVA.org:ltu-30564DiVA: diva2:1003792
Conference
International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008
Note
Godkänd; 2008; Bibliografisk uppgift: Værtspublikationsredaktører: N. Dawood; 20081125 (haknor)Available from: 2016-09-30 Created: 2016-09-30 Last updated: 2017-11-25Bibliographically approved

Open Access in DiVA

fulltext(591 kB)59 downloads
File information
File name FULLTEXT01.pdfFile size 591 kBChecksum SHA-512
a3b4adfeae3d7cdbce79374a943cf8d904e1b8a6d236d7cdddc7c197883f6d73aba79968dbf0bd7d3b83b344375b4d04f4b8610d03ac254a0587a4936b95ab8d
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Norberg, HåkanJongeling, Rogier
By organisation
Structural and Construction Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 59 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 40 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf