Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A Framework for IT Project Development in a Large Company
Stockholms universitet, Samhällsvetenskapliga fakulteten, Institutionen för data- och systemvetenskap.
2013 (engelsk)Inngår i: Procedia Technology, ISSN 2212-0173, Vol. 9, 687-696 s.Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

IT project development is a crucial point for the success of any IT organization however delays and increasing costs jeopardize the fulfillment of the business goals. Different research studies on IT project development process confirm that one individual framework is not appropriate for all types of applications. However, reality shows that many companies choose frameworks to run their IT projects based on project type and face dissimilar problems during the execution. In this research we are presenting a framework for IT project development in a large company. The framework has been developed to improve the project IT development due to the fact that many projects have failed to deliver within defined time, cost and quality. In the large company part of our study (entitled in the paper company A) the results of IT projects success rate was significantly low. Therefore, an analysis has been done to investigate the causes for not meeting the requirements. To develop the framework we have used design science research and we have evaluated this framework within company A with project managers. The novelty in this research is that the developed framework for IT project development is based on generic Capability Maturity Model and adapted to the specific needs. The result could be applied to other large companies with similar IT needs and environment.

sted, utgiver, år, opplag, sider
2013. Vol. 9, 687-696 s.
Emneord [en]
Project management, IT project development, Key Performance Areas, Capability Maturity Model
HSV kategori
Forskningsprogram
data- och systemvetenskap
Identifikatorer
URN: urn:nbn:se:su:diva-98591DOI: 10.1016/j.protcy.2013.12.076OAI: oai:DiVA.org:su-98591DiVA: diva2:684522
Konferanse
CENTERIS 2013 - Conference on ENTERprise Information Systems / ProjMAN 2013 - International Conference on Project MANagement/ HCIST 2013 - International Conference on Health and Social Care Information Systems and Technologies, Lisbon, Portugal, 23 - 25 October 2013
Merknad

This article belongs to a special issue. The issue is edited By Maria Manuela Cruz-Cunha, João Varajão, Helmut Krcmar and Ricardo Martinho.

Tilgjengelig fra: 2014-01-08 Laget: 2014-01-08 Sist oppdatert: 2014-01-08bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler

Andre lenker

Forlagets fulltekst

Søk i DiVA

Av forfatter/redaktør
Rusu, Lazar
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 37 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf