Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Översvämningsrisker inom fysisk planering: Fallstudie Karlstad
Karlstad University, Faculty of Social and Life Sciences.
2007 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Flooding risks in physical planning : Casestudy Karlstad (English)
Abstract [sv]

Mitt syfte var att undersöka hur risken för översvämningar påverkar den fysiska planeringen generellt, samt att göra en fallstudie angående översvämningsrisker i Karlstad och hur dessa påverkar kommunens tillväxtvision ”Karlstad 100 000”. Undersökningen har främst gjorts genom litteraturstudier och granskningar av olika utredningar och utvecklingsdokument.

Sverige har under de senaste åren drabbats av flera, både större och mindre, översvämningar av områden nära sjöar och vattendrag, vilka har resulterat i allvarliga miljökonsekvenser, ekonomiska förluster samt svåra skador på infrastruktur och andra samhällsfunktioner. Och klimatförändringarna förväntas förvärra problemen ytterligare. Samhällets sårbarhet inför översvämningar beror på hur stor klimatförändringen blir, men även på hur stor hänsyn som tagits till riskerna i utformningen av den fysiska planeringen. Många av de problem som uppstod under tidigare höga flöden skulle ha kunnat lösas om vattendragets avbördningskapacitet varit bättre och bebyggelse och annan infrastruktur planerats med hänsyn till höga flöden och översvämningsrisker.

Kommunerna har till följd av sitt planmonopol det största inflytandet över hur den fysiska planeringen utformas, och därmed ligger en stor del av ansvaret för anpassningsarbetet på dem. Men arbetet med att anpassa den bebyggda miljön till översvämningsrisker hamnar ofta på kollisionskurs med ekonomiska intressen i kommunerna, exempelvis vattennära bostadsbebyggelse, vilket innebär en risk för att de nödvändiga åtgärderna inte vidtas.

Osäkra och motstridiga faktaunderlag, kortsiktigt tänkande i planeringsarbetet samt en tydlig tendens av urbanisering som innebär en ökad sårbarhet för naturrisker är andra faktorer som försvårar anpassningsarbetet.

Karlstad är en av de städer som hotas av översvämningar när klimatet förändras. Närheten till Vänern samt det faktum att Klarälven rinner genom staden gör den sårbar för höga flöden. Detta skapar problem för kommunen i arbetet med den fysiska planeringen och ”Karlstad 100 000”. Kommunen har byggt en stor del av sin marknadsföring på just närheten till vatten och möjligheter till vattennära boende för att locka nya invånare till Karlstad. De anser att kunskapsunderlaget är alltför osäkert, och väljer därför att inte ta hänsyn till rekommendationerna om att inte placera nybyggnationer på översvämningshotad mark. Istället har man valt att undersöka en rad tekniska lösningar, som är betydligt kortsiktigare och även mycket kostsamma. De kortsiktiga ekonomiska vinsterna drar alltså det längsta strået i avvägningen mellan risker och ekonomiska intressen.

Abstract [en]

The purpose of the essay was to study how flooding risks affects the physical planning generally, and also to do a case study regarding flooding risks in Karlstad and how these affect the municipality vision of growth: “Karlstad 100 000”. The study has mainly been made through literature studies and scrutinises of various investigations and development plans.

During recent years Sweden has been struck by several, both severe and minor, floods of areas related to seas and watercourses, which has resulted in serious environmental consequences, economic loss and severe damage to infrastructure and other societal functions. And now, climate change is expected to make the problems even worse. The vulnerability of society regarding floods is dependent on how severe the change is going to be, but also on how much consideration is taken to risks in the shaping of physical planning. Many of the problems revealed during earlier high flows could have been solved if the unburden capacity of the watercourse had been better and if buildings and other infrastructure had been planned in consideration of high flows and flooding risks.

The municipalities has, in consequence of their planning monopoly, the greatest influence on the shaping of physical planning, hence a large part of the responsibility for the mitigation work is on them. But mitigating the built environment to flooding risks often collide with economic interest in the municipalities, for example building houses in close proximity to water, which denotes the risk that the necessary measures wont be taken. Unsure and contradictory information, short-term thinking in planning and an obvious tendency for urbanisation leading to an increased vulnerability for nature risks are other factors that complicates the mitigation work.

Karlstad is one of the cities threatened by floods when the climate is changing. The close proximity to Vänern and the fact that Klarälven runs through the city makes it vulnerable to high flows. This creates a problem for the municipality regarding the work with physical planning and “Karlstad 100 000”. The municipality has based a large part of it’s marketing on the close proximity to the water and the possibility for estuaries next to water in order to attract new inhabitants to Karlstad. They argue that the state of knowledge is to uncertain, and thereby choose not to incorporate the recommendations regarding no new buildings on land threatened by floods. Instead, the municipality has chosen to investigate technical solutions to the problem, which could be considered a far more short term and also very expensive way of dealing with the problem. Thus, the short term economic profits seem to get the upper hand in the weighing between risks and economic interests.

Place, publisher, year, edition, pages
2007. , p. 44
Keywords [sv]
Fysisk planering, Översvämningar, Risker
National Category
Landscape Architecture
Identifiers
URN: urn:nbn:se:kau:diva-1194Local ID: MIV C-5Archive number: MIV C-5OAI: oai:DiVA.org:kau-1194DiVA, id: diva2:4999
Subject / course
Environmental Science
Presentation
2007-06-07, 00:00
Uppsok
Agriculture, Veterinary Medicine, Forestry
Supervisors
Examiners
Available from: 2007-10-05 Created: 2007-10-05 Last updated: 2015-10-21

Open Access in DiVA

fulltext(6863 kB)1628 downloads
File information
File name FULLTEXT01.pdfFile size 6863 kBChecksum MD5
5e0627e27011ddd88ef7c6ad8ac7e7f8dd481c4de4278e514bc0497e9a579088824104c5
Type fulltextMimetype application/pdf

By organisation
Faculty of Social and Life Sciences
Landscape Architecture

Search outside of DiVA

GoogleGoogle Scholar
Total: 1628 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1788 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf