Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Securing an ERP Implementation
Växjö universitet, Fakulteten för matematik/naturvetenskap/teknik, Matematiska och systemtekniska institutionen.
2008 (Engelska)Självständigt arbete på grundnivå (kandidatexamen), 10 poäng / 15 hpStudentuppsats
Abstract [en]

An implementation project of an ERP system results in large changes. Organizations

that face an ERP implementation project have several risks to

consider in order to avoid problems that cause failures. The purpose of

this research is to extend existing models and create a method for implementation

of ERP systems. The method has then been employed to an

ongoing project at the department of Procurement and Supply at Ericsson

Mobile Platforms in Lund. Objectives for the research are to consider

which implementation strategy can be used and how an organization can

minimize risks.

The research approach and methodology is influenced by the qualitative

research method since it was necessary to gather qualitative facts instead

of quantitative facts. Included is also a case study due to the research is

executed within Ericsson Mobile Platforms in Lund.

There are two main opposite implementation strategies, Big Bang and

Step-by-Step. The choice of implementation strategy depends on number

of factors like the size of the organizations, complexity and resources.

A method of ERP implementation has been put forward as a result of the

integrated models. The method includes an overall model and a check list.

Risk identification is a problem that many implementation project faces, a

way to solve this is to make a careful risk analysis, a risk matirx with several

identified risks are putted forward throughout this study.

Ort, förlag, år, upplaga, sidor
2008. , 64 s.
Serie
Rapporter från MSI, ISSN 1650-2647
Nyckelord [en]
ERP implementation project, choice of implementation strategy, Risk identification, Method for implantation, Pre-study
Nationell ämneskategori
Systemvetenskap
Identifikatorer
URN: urn:nbn:se:vxu:diva-1882OAI: oai:DiVA.org:vxu-1882DiVA: diva2:205750
Uppsök
samhälle/juridik
Handledare
Examinatorer
Tillgänglig från: 2008-02-21 Skapad: 2008-02-21 Senast uppdaterad: 2010-03-10Bibliografiskt granskad

Open Access i DiVA

fulltext(1268 kB)7155 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 1268 kBChecksumma SHA-1
c0d7860aa76350de0430937ae67b292d5a96c943ce49e19f95c49f8a6d9bf7b183e674c5
Typ fulltextMimetyp application/pdf

Av organisationen
Matematiska och systemtekniska institutionen
Systemvetenskap

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 7155 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

Totalt: 2119 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf