Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Projektering av allmänt lokalnät i landsbygdsmiljö med analys av kapacitivaströmmar
Halmstad University, School of Information Technology.
Halmstad University, School of Information Technology.
2019 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

A general local powerline has implemented to mimic a lifelike powerline build around 1960s in thecountryside. Since reconstruction is needed a new projection is made of the area to improve the powerquality. The projection includes the old transmission lines will be replaced with underground powercables to make it weatherproof. The implication of underground power cables leads to smaller distancebetween the phases which generates greater capacitance. Due the increase will make the capacitivecurrents greater as well which affect the power quality for the costumers in the area.

The projectionmust be adapted to the increase of earth fault currents which the capacitive currents contribute. The regeneration of the old and new power lines consists a sketch of terrain, merge of the powerconsumption, electrical fuses, line diagram, sizing transformers and right dimensions of cables. Calculations on capacitive fault current, voltage drop as well as neutral grounding reactor (a resistanceparallel with an inductor) was executed. Calculations of the powerline followed Swedish standard andthe neutral ground reactor after the norms of Swedish electrical industry.

Regard to the projection, including underground cables, the capacitive fault currents increased with 46,75 times compared to transmission powerlines at 10 kV. Calculations of the neutral ground reactorresulted in 5,25 Henry for the inductor and 1154 Ohm for the resistor to compensate the gain. The conclusion is that weatherproofing the powerline at 10 kV leads to compensating otherwise the powerquality and selectivity will be affected. That result in a more expensive arrangement cost forunderground cables compared to transmission.

Place, publisher, year, edition, pages
2019. , p. 57
Keywords [sv]
kapacitiva strömmar, projektering, kabelförläggning, luftledning, lokalnät, nollpunktsreaktor
National Category
Other Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hh:diva-39731OAI: oai:DiVA.org:hh-39731DiVA, id: diva2:1323790
Educational program
Electrical Engineer, 180 credits
Supervisors
Examiners
Available from: 2019-06-18 Created: 2019-06-12 Last updated: 2019-06-18Bibliographically approved

Open Access in DiVA

fulltext(6544 kB)29 downloads
File information
File name FULLTEXT02.pdfFile size 6544 kBChecksum SHA-512
8ac5759191657346f14aae13bdc711baf1da8215b64ad9c3aed56a363788dedfdd9ad1c0c0cadd3828740f9c8f30732cc623a9b00e1e1d117c416bfe2313019b
Type fulltextMimetype application/pdf

By organisation
School of Information Technology
Other Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 29 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 31 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf