Determination of potential failure initiation time using cumulative sum chart
2016 (engelsk)Inngår i: IFAC-PapersOnLine / [ed] Christos Emmanouilidis, Benoît Iung, Marco Macchi and François Pérès, Elsevier, 2016, Vol. 49:28, s. 43-48Konferansepaper, Publicerat paper (Fagfellevurdert)
Abstract [en]
Hard competition forces companies to reduce uncertainty in production planning through, e.g. reducing the probability of failures. In this paper, more accurate data analysis through reducing randomness in vibration measurements is introduced. Quality control tool Cumulative Sum (Cusum) Chart is adapted for monitoring variation in vibration level to determine the time of potential failure initiation. The result confirms the possibility of reducing false alarms arise due to randomness in vibration signals. The major conclusion; applying Cusum chart it is possible to determine the time of initiation of a potential failure for follow up its progression and accurate planning of maintenance.
sted, utgiver, år, opplag, sider
Elsevier, 2016. Vol. 49:28, s. 43-48
Serie
IFAC-PapersOnLine, ISSN 2405-8963
Emneord [en]
Condition Monitoring, Failure Consequences, Identification of the Time of a Potential Failure Initiation
HSV kategori
Forskningsprogram
Teknik, Systemekonomi
Identifikatorer
URN: urn:nbn:se:lnu:diva-59119DOI: 10.1016/j.ifacol.2016.11.008ISI: 000401258400008Scopus ID: 2-s2.0-85006339785OAI: oai:DiVA.org:lnu-59119DiVA, id: diva2:1057616
Konferanse
3rd IFAC Workshop on Advanced Maintenance Engineering, Services and Technology AMEST 2016 Biarritz, France, 19—21 October 2016
2016-12-192016-12-192019-02-26bibliografisk kontrollert