Digitala Vetenskapliga Arkivet

Driftmeddelande
För närvarande är det driftstörningar. Felsökning pågår.
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A case based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies
Department of Management in the Built Environment, Delft University of Technology, Delft, The Netherlands.
Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle, Industriell Ekonomi.ORCID-id: 0000-0002-1746-2637
Department of Real Estate and Construction Management, KTH Royal Institute of Technology, Stockholm, Sweden.
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Industriellt och hållbart byggande.ORCID-id: 0000-0001-9524-4814
2018 (Engelska)Ingår i: Proceeding of the 34th Annual ARCOM Conference, ARCOM 2018 / [ed] Gorse, C. & Neilson, C.J., Association of Researchers in Construction Management (ARCOM), 2018, s. 515-524Konferensbidrag, Publicerat paper (Refereegranskat)
Abstract [en]

The purpose of this paper is to investigate and compare in what ways different types of integrative and collaborative procurement strategies may enhance efficiency and innovation in public infrastructure projects. Further, implementation challenges are identified and discussed. Interview-based case studies were performed of ten infrastructure projects in Sweden and the Netherlands. The projects involve four types of collaborative procurement strategies - collaborative Design-Build (DB) contracts, Early Contractor Involvement (ECI) agreements, Design-Build-Maintain (DBM) contracts and Design-Build-Finance-Maintain (DBFM) contracts. The findings indicate that the duration of the collaboration is fundamental in setting the limits for innovation and that early involvement as well as long-term commitments open up for more innovation. Naturally, the potential for increased efficiency is higher than for innovation and also occurs in collaborations with limited duration. These integrated project approaches, however, still appear to be in an early stage of learning. For a public repeat client to realise the full potential of a new strategy, it is important to have a long-term perspective and capabilities to analyse and learn from the experiences.

Ort, förlag, år, upplaga, sidor
Association of Researchers in Construction Management (ARCOM), 2018. s. 515-524
Nationell ämneskategori
Annan teknik Byggproduktion
Forskningsämne
Byggproduktion och teknik; Entreprenörskap och innovation
Identifikatorer
URN: urn:nbn:se:ltu:diva-72063Scopus ID: 2-s2.0-85055672634OAI: oai:DiVA.org:ltu-72063DiVA, id: diva2:1271301
Konferens
34th Annual Association of Researchers in Construction Management Conference, ARCOM 2018, Belfast, United Kingdom, 3-5 September 2018
Tillgänglig från: 2018-12-17 Skapad: 2018-12-17 Senast uppdaterad: 2025-10-22Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

Scopushttp://www.arcom.ac.uk/-docs/archive/2018-Indexed-Papers.pdf

Sök vidare i DiVA

Av författaren/redaktören
Eriksson, Per-ErikLarsson, Johan
Av organisationen
Industriell EkonomiIndustriellt och hållbart byggande
Annan teknikByggproduktion

Sök vidare utanför DiVA

GoogleGoogle Scholar

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 430 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf