Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Hur samlar Skanska in information vid kalkylering?
KTH, Skolan för industriell teknik och management (ITM), Industriell produktion.
KTH, Skolan för industriell teknik och management (ITM), Industriell produktion.
2010 (svensk)Independent thesis Basic level (degree of Bachelor), 10 poäng / 15 hpOppgave
Abstract [sv]

I dagens industrisamhälle anses projektarbete som den självklara modellen för utvecklingsarbete. Första steget i projekt där information spelar en väsentlig roll är vid kalkylering . Det är här projektets framtid avgörs. Här gäller det att vara tydlig med den information som sammanställs samt lagra den för effektiv åtkomst för projektmedlemmarna. Utan ett väl fungerande informationsflöde får organisationen svårt att anpassa sig till förändringar samt problem som uppstår. Syftet med denna studie är att undersöka hur kalkylering sker i teorin och i praktiken för att få en förståelse för hur informationsflödena spelar sin roll. Den teoretiska referensramen baserades på de teorier som påträffades vid en sökning bland KTHB:s databaser samt Google Scholar. Informationsflödet har delats upp i tre delar, presentation, transport och lagring av information. Dessutom studeras ett antal olika kalkylmetoder. För att få en kompletterande bild av hur detta applicerats i praktiken har en fallstudie utförts på Skanska Sverige AB. Denna studie omfattar tre intervjutillfällen samt en kontinuerlig kontakt med en inköpsansvarig på Skanska. Kalkylmetoderna som undersöktes var ABC – kalkylering, produktkalkylering och produktionskalkylering. Sedan undersöktes vilka av dessa kalkylmetoder som används på Skanska Sverige AB. Kalkyler upprättas utifrån företagets informationshanteringssystem och Skanska använder sig av ett eget utvecklat system, Spik. Vidare undersöktes vilken typ av information som har störst påverkan vid kalkylens utformning och vilka faktorer som är avgörande. Teoristudierna jämförs med empirin genom diskussion om informationsflödets betydelse vid kalkylframtagning på Skanska. Därefter diskuteras rekommendationer om hur informationsflödet skulle kunna förbättras vid framtagningen av kalkylen.

Abstract [en]

In today's industrialized society projects are considered as the obvious model for development. The first step in projects where information plays an essential role is in calculations. This is where the projects future is decided. Here it is important to be clear about the information compiled and making sure that the storage of the information is easily accessed for the project members. Without a proper flow of information, the organization will have difficulty adapting to changes and problems that arise. The purpose of this study is to investigate how the calculation is made in theory and in practice to get an understanding of how the flow of information plays its role.The theoretical framework was based on the theories that were found in a search among KTHB databases and Google Scholar. The information flow has been divided into three parts, presentation, transport and storage of information. Also studied are a number of different calculation methods. To obtain a complementary picture of how this is applied in practice, a case study has been conducted at Skanska Sverige AB. This study includes three interview occasions and continuous contact with a purchasing manager at Skanska. The calculation methods that were examined were ABC - calculation, product calculation and production calculation. Later examined were which of these calculation methods is used at Skanska Sweden AB. Calculations are made from the company's information management system and Skanska use a custom developed system, Spik. It was further examined which type of information that has the greatest impact on the modeling of the calculations and which factors that are crucial. The theory studies are compared with the empirical studies through discussion about the flow of informations role in the development of calculations at Skanska. Later discussed are the recommendations on how the information flow could be improved in the development of calculations.

sted, utgiver, år, opplag, sider
2010. , s. 21
Serie
Examensarbete inom teknik och management, grundnivå ; 83
HSV kategori
Identifikatorer
URN: urn:nbn:se:kth:diva-91071OAI: oai:DiVA.org:kth-91071DiVA, id: diva2:508002
Fag / kurs
Production Engineering
Uppsök
Technology
Examiner
Tilgjengelig fra: 2012-03-14 Laget: 2012-03-07 Sist oppdatert: 2012-03-14bibliografisk kontrollert

Open Access i DiVA

fulltext(147 kB)1251 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 147 kBChecksum SHA-512
1a90f524afa41a49a69d18c20a45ca27eb2aa6d0c8320532f21ed23b200d5499410372d10394a1d7974aabcbed3dd4a21bcc790ec0ac03417eae6803ab74c50f
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 1251 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 951 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf