Digitala Vetenskapliga Arkivet

Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Lean Construction applicerat på betongkonstruktion: The Last Planner och visuell metodik för reducering av produktionstidsvariationer
KTH, Skolan för industriell teknik och management (ITM), Industriell ekonomi och organisation (Inst.), Industriell ekonomi och organisation (Avd.).
2011 (svensk)Independent thesis Advanced level (degree of Master (Two Years)), 20 poäng / 30 hpOppgaveAlternativ tittel
Lean Construction applied to concrete structure (engelsk)
Abstract [sv]

Bakgrunden till detta examensarbete är byggföretagens utmaningar med att bedriva byggprojekt där nya och unika objekt skall konstrueras, med många nya förutsättningar och allt som oftast även en ny sammansättning av personalstyrkan. Ett gemensamt behov för dessa byggprojekt är att effektivt kunna hantera en mängd av olika och nya variationer.

Oden anläggningsentreprenad AB presenterade ett problem gällande oönskade variationer av produktionstider för betongmonoliter som innefattar mycket repetitiva arbetsmoment. Examensarbetets syfte blev att besvara följande frågor:

  • Vilka är faktorerna som påverkar variationer i produktionstiden vid bygget av betongmonoliter?
  • Vilka är lösningarna till att reducera faktorerna som negativt påverkar produktionstiden?
  • Hur ska de nya lösningarna implementeras?

I examensarbetet har teorier kring lean production, lean construction, organisationsförändring och betongkonstruktioner undersökts. Det empiriska materialet har hämtats genom att författaren deltagit i produktionen och fört en fältdagbok över dagliga problem som produktionspersonal påtalat. En annan del av empirin har hämtats från en workshop där produktionspersonal kartlagt processer och aktiviteter samt dess mest optimala ordningsföljd. På workshopen har även en kartläggning av ansvarsfördelningen för aktiviteterna utförts.

Problemen från fältdagboken har kategoriserats och de fyra största kategorierna blev planering, kommunikation, materialhantering och logistik samt ansvarsfördelning. Efter analys av problemen, och med stöd av lean construction teorier, har lösningsförslagen givits att införa nya rutiner innan projektens produktionsstart samt att använda planeringsmetoden The Last Planner kompletterat med visuella metoder. Vid en implementering av förslagen ges även förslag om aspekter att ta hänsyn till gällande förändringsagenter och motståndshantering. 

Examensarbetets slutsats är att innehållet i det empiriska materialet pekat ut de faktorer som skapar oönskade variationer i produktionstiderna. Lösningsförslagen som byggts på det empiriska materialet samt stödet från lean construction teorierna anses ge goda möjligheter till att minska variationerna i produktionstiderna för betongmonoliter.

Abstract [en]

The background to this thesis is the construction companies’ challenges to engage in construction projects where new and unique objects are to be constructed, with many new conditions and quite often even with a new composition of the workforce. A common need for these construction projects is the need to effectively manage a variety of new and different variations.

Oden anläggningsentreprenad AB presented a problem regarding unwanted variations in production times in the construction of concrete monoliths, which include highly repetitive tasks. The purpose of the thesis was to answer the following questions:

  • Which are the factors that affect fluctuations in production time during the construction of concrete monoliths?
  • Which are the solutions to reducing the factors that negatively affect production time?
  • How should the new solutions be implemented?

A study has been made of theories in lean production, lean construction, organizational change and concrete structures. The empirical data has been gathered by participating in the daily production, and by maintaining a field diary of daily problems that the production staff brought to the authors attention. Another part of the empirical data has been gathered from a workshop where the production staff identified processes and activities and placed them in their most optimal order. A mapping of responsibilities for the activities was also made at this workshop.

The problems from the field diary have been categorized and the four largest categories were planning, communication, material handling and logistics, and responsibilities. After an analysis of the problems, and with the support of lean construction theory, some solutions have been proposed which is to introduce new routines before the start of production in new projects and to use the planning method called The Last Planner supplemented by visual aids. With the purpose of implementing the new solutions a proposal is provided with aspects on change agents and management of resistance to changes.

The conclusions of this thesis are that the empirical evidence has identified the factors that create unwanted variations in production times. The solutions that are proposed are based on the empirical evidence and the support of lean construction theories. Therefore it provides the opportunities needed to reduce the variations in production times for concrete monoliths.

sted, utgiver, år, opplag, sider
2011. , s. 74
Serie
Examensarbete INDEK ; 2011:53
Emneord [sv]
Lean Construction, The Last Planner, Visuell planering
HSV kategori
Identifikatorer
URN: urn:nbn:se:kth:diva-34880OAI: oai:DiVA.org:kth-34880DiVA, id: diva2:424114
Utdanningsprogram
Master of Science in Engineering - Industrial Engineering and Management
Uppsök
Technology
Veileder
Examiner
Tilgjengelig fra: 2011-06-22 Laget: 2011-06-17 Sist oppdatert: 2022-06-24bibliografisk kontrollert

Open Access i DiVA

fulltext(6164 kB)821 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 6164 kBChecksum SHA-512
43223880a7701d3a530f6e6133ad39cd4e70fceaba57e4e11af997c8e9a501df70e176b892dffde3269218a4eaa35521928c564e588cfb8b5a2c9dbdd2b199f6
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 821 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 598 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf